Independent punctuality data for newsrooms and researchers
Andana records, train by train, when each Rodalies service reaches its last stop, using Renfe’s public real-time data. You can quote, download and reuse the figures: just credit the source.
The latest service days
Between 15 Nov and 21 Nov, Andana measured 3,529 Rodalies trains: 88.6% reached their last stop 3 minutes or more late.
Download the data
Daily punctuality by line
One row per line and service day for the last 30 days. Validated operators only (for now, Rodalies).
Download the CSV →Monthly barometer
Published on the 1st of each month, once there is a full month of data, with a CSV of every line.
Open the barometer →Methodology
What counts as late, what we leave out and when a line is published.
Read the methodology →Key facts
- We have measured Rodalies since 20 October 2026.
- A train counts as late if it reaches its last stop 3 minutes or more behind schedule.
- Trains that stop reporting before they arrive are left out of every percentage, and we do not count them as cancelled.
- FGC and TRAM are not published yet: we first check their figures against an independent source.
- Andana is independent: it is not an official app and no operator funds it.
How to cite us
Source: Andana (andana.app), an independent punctuality record built from Renfe data. Always state the lateness threshold and the period. The figures and CSVs may be reused with attribution (CC BY 4.0).
Contact
For the figure for one line, an interview or a correction, write to [email protected].
Logo
Download the logo (SVG) →Download the logo without background (SVG) →